Collecting keys to your new BTO flat is exciting—but before you move in, a thorough inspection is essential. Here’s your ultimate BTO key collection checklist:

Structural & Walls

  • Cracks, holes, or uneven surfaces
  • Paint and finishing quality

Flooring

  • Uneven tiles or scratches
  • Gaps between floor and skirting

Doors & Windows

  • Smooth opening/closing
  • Proper locking mechanisms
  • Water leaks or drafts

Plumbing & Bathrooms

  • Water pressure and drainage
  • Leaks under sinks and toilets
  • Waterproofing checks

Electrical Systems

  • Functioning switches and sockets
  • Proper placement of outlets
  • Lighting and fans operational

Kitchen & Fixtures

  • Cabinets and countertops quality
  • Taps and water connections

Additional Tips

  • Take photos of all defects
  • Schedule inspections immediately after key collection
  • Keep a copy of the inspection report for submission to the developer

At Prime Defectors, our inspectors guide you step by step and provide a comprehensive, photo-rich report to ensure no defect is overlooked.

Related Blogs

Comprehensive Home Inspection Services in Singapore: The 2026 Property Owner’s Guide

Comprehensive Home Inspection Services in Singapore: The 2026 Property Owner’s Guide

Did you know that an average of 65% of HDB BTO homeowners in Singapore have reported defects requiring...
5-Room BTO Defect Check Cost: 2026 Singapore Homeowner’s Pricing Guide

5-Room BTO Defect Check Cost: 2026 Singapore Homeowner’s Pricing Guide

Did you know that 65% of new HDB homeowners in Singapore reported defects during their first year? While...
Understanding the 4-Room BTO Inspection Fee in Singapore: A 2026 Cost Guide

Understanding the 4-Room BTO Inspection Fee in Singapore: A 2026 Cost Guide

Would you buy a car without a test drive, or move into a new flat without knowing what's...